Kitchen Remodeling in Georgia
Real Georgia kitchen pricing, where the budget actually goes, and how to avoid the $10k surprises that hit most homeowners mid-project.
How long it takes
Cabinet/counter refreshes finish in 2–3 weeks. Mid-range remodels take 6–10 weeks. Full gut jobs with layout changes run 10–16 weeks, plus 4–8 weeks of design before work starts.
Permits & inspections
Required for any electrical changes (added circuits for islands, induction ranges), plumbing relocations, gas line work, and any wall removal. Cabinet swaps without electrical or plumbing changes usually do not need a permit.
Mistakes that cost the most
- Ordering cabinets before measuring the actual rough-in (recipe for a 6-week delay)
- Choosing appliances last — they dictate cabinet dimensions
- Undersizing the electrical panel — modern kitchens need 200A service
- Skipping the under-cabinet lighting rough-in (costs 4x to add later)
- Picking trendy finishes you'll regret in 5 years
Contractor tips
- 1Hire a kitchen designer separately from your contractor — different skill set
- 2Get appliance specs in hand before sign-off on cabinet plans
- 3Order all cabinets and counters before demo to avoid downtime
- 4Plan for a temporary kitchen with a microwave, mini-fridge, and hot plate
- 5Insist on dust containment — kitchen dust travels through the whole house
Financing
HELOC rates are typically the cheapest route. Watch out for kitchen showroom financing — promotional 0% deals often add 8–12% to the cabinet price.
Related guides
Project inspiration & walkthroughs
Real Georgia homeowner walkthroughs, contractor tips, and before/after projects from the YakYak community.
Frequently asked
Where does the budget actually go?
Roughly: 30% cabinets, 15% appliances, 12% counters, 10% labor, 8% flooring, 8% plumbing/electrical, with the rest in fixtures, lighting, and contingency.
How long without a kitchen?
Plan on 4–8 weeks of no working kitchen during a mid-range remodel. Most contractors can keep it tighter with careful sequencing.
Should I move walls?
Only if you'll stay 7+ years or it solves a real flow problem. Moving load-bearing walls adds $8,000–$25,000 fast.